欧美性爱第1页_無遮擋在線視頻_91视频污污污观看_精品福利国产小视频_日韩亚洲精品影院_蜜臀国产精品一区二区_91色偷偷综合久久噜噜_亚洲最大欧美色图_日本中文字幕乱码系列_国产桃色一区视频

Your position: 首頁>>Products>>Flame laminating machine

Product list

contact us
Hotline150-5066-3101

Shengdun Machinery

Contact:Mr. Chen (Manager)

Mobile:150-5066-3101

Tel:0515-88893101

Email:476068497@qq.com

Add:shuangchuang Industrial Park, Dagang Town, Yandu District, Yancheng City, Jiangsu Province



Flame laminating machine
C-type flame compound machine
Brand:Sangdion Machinery
Producer:Jiangsu Yancheng
Hotline:150-5066-3101

Details

The main configuration parameters of SD-H2100 flame compound machine


Custom flame compound machine, flame machine, sponge compound machine, automobile interior sponge compound machine


Equipment technical parameters:

1、

Working width:

1000~2000mm(customize)

2、

Mechanical spokes:

2100mm

3、

Equipment line speed:

0~45 m/min

4、

Equipment size (length * width * height):

28280×2600×2800 mm

6、

Total power of equipment:

Around 15KW

7、

electricity supply:

380V 50Hz

8

Total weight of equipment:

About 1750KG

Equipment characteristics:


SD-H2100 equipment control, humanized operation, easy maintenance, constant tension, high-precision fire exhaust device, easy to control the stability of the fire.

SD-H2100 device features:

1、

Button control used;

2

easy to use;

3、

Equipped with a built-in fire exhaust combustion system;

4

Constant tension passing material;

5、

Simple feeding method;

6

The humanized design of the machine saves operators;

7、

Equipped with water cooling device for cooling.

SD-H2100 operation precautions:

Operators can only operate this equipment after they are fully familiar with the machine's performance and working principles. This equipment must be operated by a dedicated person, and non-operating personnel cannot open or move randomly.


Before production, check whether electrical appliances such as cables, circuit breakers, contactors, and motors meet the requirements.


Before production, check whether the three-phase power supply is balanced, and it is strictly forbidden to start the equipment without phase.


During the production period, check whether each rotary joint is safe, whether the pipeline is unblocked, whether there is any damage or oil leakage, and remove it in time.


Before production, check whether the pressure of each barometer is normal, whether there is any leakage in the gas path, and repair it in time


Before production, check the fastening of each connection to see if there is any looseness or falling off, and repair it in time.


Before mass production of the equipment, a small amount of test should be done first, and mass production can only be carried out after success.


Before production, check the lubrication conditions of various hydraulic stations, reducers, bearing bushes, lead screws, etc., and fill in hydraulic oil and lubricating oil in a correct and timely manner.


After the machine is stopped, the dust collection parts and other accessories must be applied in time, and the rubber roller must be used to remove the residual material and dirt of each part of the machine for the next use.


It is strictly forbidden to contact corrosive liquids with the rubber rollers, and always ensure that the surface of each drive roller is clean and free of foreign matter.


It is strictly forbidden to pile up debris around the host system, and keep the host clean and free of foreign objects at all times. Ensure a certain heat dissipation effect.


SD-H2100 maintenance and maintenance:

The lubricating oil of the reducer should be changed every six months. ·


The dust collection device is regularly checked and replaced according to the actual production situation.


The hydraulic oil tank should be replaced with N46 or N32 anti-wear hydraulic oil every six months.


Check the hydraulic oil tank, the oil tank of the hot oil machine once a month, remove the grease, remove the impurities, and add enough lubricating oil and heat transfer oil


Lubricating oil should be added to the bearings and screws every shift.


After each shutdown, accessories such as dust collection parts and anilox rollers must be removed in time to remove residual materials and dirt from all parts of the machine.


The chain should be checked every shift to ensure normal lubrication and timely tensioning.


Check the connecting parts every shift, and whether the fasteners are loose or missing, and fasten them in time.


Check the oil pumps, cylinders, solenoid valves, distribution valves, oil pipes and other connections for oil leakage every shift.

Prev:C-type flame compound machine
Next:最后一篇